Here are the pictures of the upper unit hung in place with the french cleat.  I added some additional anchors near the bottom, although they are probably not needed.  An LED light pack was added, along with some outlet work, and a switch that is hidden behind the center vertical stile (thanks to Brian Dilley for doing this work).



After taking a day off for the weekend, construction was resumed, and the side sections between the upper and lower units were added.  There will be one shelf in each.  The corners near the outside walls will also have a similar upright cabinet area.